Babcock Elementary School Proposed Master Plan

Interactive Campus Map:
Click any Area to view details


babcock ELEMENTARY SCHOOL

Street Address: 4315 Don Julio Boulevard, North Highlands, CA 95660
Phone: (916) 566-1810 | Fax: (916) 566-1811
Principal: Jacqueline Dewitt
Grade: K-6
Enrollment: 458
Constructed: 1960
CDS Code: 34 76505 6033476
Building Area: 31,688 SF
Site Acreage: 12.29
Enrollment: 466
Capacity: 389


Project Totals by Priority

Total for all priorities $32,234,755.53

Building Costs by Discipline

Input Recommendations

Click for Details:

 

New Construction Input

  • Option 1: Construct a new Multi-Purpose Building adjacent to Library with covered lunch patio and with public/service access from parking lot. (relocate Child Care into existing MPR)
  • Option 2: Construct a permanent, possibly two-story Child Care facility within interior restrooms (the school is the site of the District-wide day care program during summer months)

Renovation Input

Convert two Classrooms into Preppy K or Kindergarten Rooms with restroom additions. Consider future uses for Computer Lab(s) if hand held devices become a standard. Raise Classroom window sills to provide more display area and increase security. Restrooms: Update fixtures and surfaces (M/O). Roofing: All roofs need to be sealed. (M/O)HVAC: Insulate ducts and replace roof mounted units. (M/O)Plumbing: Rusty water in galvanized supply lines, update restrooms. (M/O)Fire Alarm: Upgrade main panel. (M/O)Electrical: Main panel replacement (M/O).

Site Work Input

Consider a loop road that would allow easier access back to new day care buildingInstall block walls across the front and rear sides of the campus for security and privacy to lunch shelter, kindergarten playground and from adjoining City trailReplace and level patio at south side of Rooms 3-7Create a permanent ‘fitness course’ in the playfield and refurbish turf/irrigationAdd sidewalks connecting finger plan classroom wingsUpgrade site drainage around buildingsPlayground equipment, shade and surfacing: Update and refresh (M/O)Campus irrigation system upgrade (M/O)Solar panels are proposed for the campus

Furniture/Technology Input

Upgrade technology for better connectivityPermanent mounting for projectors, cameras and/or monitorsNew, flexible, furniture needed for 21st Century classroomsPA/Clock/Phone Systems need upgrading (M/O)Access Control System (M/O)

Existing Allison Campus